- Submit a Project Report for 5000 TCD Capacity Sugar plant, 60 KLPD distillery including Cogeneration & power evacuation, Refinery and Ethanol plant to be operated at 3500 TCD in First year.
- Brief recommendation of system for fire protection for sugar complex consisting of sugar plant, cogeneration, refinery and distillery plant.
- system for air conditioning and ventilation in power plant.
- Performance parameters of the sugar complex in the proposed configuration in terms of efficiency, extraction, recovery, steam consumption, power export, power consumption, water consumption, production of ENA / ethanol, effluent generation, sugar quality, etc.
- Technical Specification preparation for Sugar, Cogeneration & power evacuation, Refinery and Ethanol plant and machinery. This will cover:
Formulate and list the machinery required for the plant with above criteria.
Detailed technical specifications & Technical schedule/data sheets for all the above machinery for evaluation of the recommended plant for the sugar, cogeneration & power evacuation, Refinery and Ethanol factory;
Submit detailed technical specification for transmission line for delivery of factory export power to the Grid, upto factory metering yard.
Provide P & I diagram with control logic for automation of sugar complex for DCS operation.
Provide basic engineering for measuring and control;
Set the performance norms for the machinery in each section.
- Finalization of general arrangement drawings and technical specification provided by suppliers/ manufacturers for vendor qualification and preparation of layout drawings.